Categories
Uncategorized

In progress

I’m working towards a group ride on 28 Nov, so I need the C201 running and hopefully registered. Three weeks left.

In the last week I finally got the frame assembled and wheels attached. It’s now a rolling frame.

I have most of the bits I need to at least get it running, although I am a little worried about the electrics.

So installing the electrics and motor is the goal for this week. Maybe I can get it to run?

Leave a Reply

Your email address will not be published. Required fields are marked *